The team of “Energo UA” has been carrying out electrical installation work of any complexity on a turnkey basis since 2011.
Installations up to 35 kV:

- laying cable lines in trenches;
- cables in pipes, tunnels;
- repair and reconstruction of cable power lines.
Instalation of power lines of up to 10kV:
- installation of cable lines (laying in trenches);
- installation and reconstruction of transformer substations of 10/0.4 kV;
- installation of complex transformer substations of 10/0.4 kV.
Instalation of electrical cables 0.4 kV:
- installation of cable infrastracture;
- cable instalation;
- instalation of lighting;
- installation of accessories (sockets, switches, etc.);
- installation of internal site networks (by air, in the ground);
- installation of grounding and lightning protection systems.
- commissioning works;
- electrical circuit testing;
- on site on-going operational maintenance of electrical facilities.

Electrotechnical laboratory
LLC “Energo UA” offers the services of an electrical laboratory for a set of works on measuring and testing of electrical circuits and devices.
Electrical laboratory offers testing of:
Cables lines.
- testing earthing circuits resistance:
Earthing devices:
- the measurement of the resistance of the grounding device;
- checking the existance and condition of the network between the grounding conductors and the grounded elements;
- checking functionality of protection in electric installations with the grounded neutral.
Electrical devices, secondary circuits and wiring of up to 1 kV:
- measurement of insulation resistance;
- check functionality of protection with the grounded neutral;
- high voltage testing.
Our projects
Network of fitness clubs №1 “Sport Life”
- manufacture and installation of switchboard equipment;
- electrical instalation of internal power supply of the site;
- installation and laying of a cable in trays;
- between phase volage balance;
- insulation resistance measurements.

«GEOS» LLC
Internal electrical work installation of switchboard equipment of an administrative-residential building on the street Metropolitan Vasyl Lypkivsky (Urytsky), 35 in the Solomianskyi district of Kyiv, ADAMANT Residential Complex.

Shevchenkivskyi district of Kyiv
Overhaul of internal power supply networks of residential buildings.

Antonov plant – installation of cable lines up to 35 kV:
- installation of cable lines with voltage up to 100 kV;
- finding damages to cable lines;
- installation of cable couplings up to 20 kV;
- testing of cable lines after the works completion.
Solar power plant “Tavanskaya 3”
Electrical instalation of solar panels at the ground photovoltaic power station

Solar power plant “Astaria”
Electrical instalation of solar panels at the ground photovoltaic power station

Pedestrian crossing lighting:
Lighting of transitions by autonomous power supply systems on the basis of solar batteries in the settlements of the Kiev region:


